Forth Crossing Act 2011
Forth Crossing Act 2011 (2011 asp 2)
- Forth Crossing Act 2011 (2011 asp 2)
- Part 1 Works
- 1 Power to construct Forth Crossing etc.
- 2 Bridge proportions
- 3 Maximum construction height
- 4 Limits of deviation etc.
- 5 Bridge marking and lighting
- 6 Interference with navigation
- 7 Dredging etc.
- 8 Marine (Scotland) Act 2010
- 9 Interference with railways
- 10 Trees and shrubs
- Part 2 Roads
- 11 Special roads
- 12 Trunk roads
- 13 Roads to be transferred to local roads authorities
- 14 Stopping up of roads
- 15 Stopping up of means of access
- 16 Extinction of rights of way
- 17 Solum of stopped up road
- 18 Works in roads where Ministers are not the roads authority
- 19 Access to public roads
- 20 Application of the Roads (Scotland) Act 1984
- Part 3 Land
- 21 Incorporation of enactments
- 22 Compulsory acquisition of land
- 23 Acquisition of land by agreement
- 24 Acquisition of servitudes and other rights
- 25 Extinction of real burdens and servitudes etc.
- 26 Persons under a disability may grant servitudes, etc.
- 27 Registration of servitudes and other rights
- 28 Minerals
- 29 Time limit for compulsory acquisition
- Part 4 Taking title to land
- Notice to treat procedure
- 30 Service of a notice to treat
- 31 Partial acquisitions using notice to treat procedure
- 32 Severance disputes (notice to treat procedure): Lands Tribunal
- 33 Severance of agricultural land
- 34 Notice to treat: time limit
- General vesting declarations
- 35 General vesting declarations
- 36 Duty to publicise general vesting declarations
- Part 5 Powers to enter and use land
- 37 Temporary possession of land
- 38 Power to enter land for other purposes
- 39 Advance entry on land to be acquired
- 40 Notice of entry
- 41 Use of land
- 42 Duty to remedy damage etc.
- 43 No power to enter homes
- 44 Warrants authorising entry
- 45 Obstruction
- 46 Suspension of real burdens and servitudes etc.
- Part 6 Compensation
- 47 Land Compensation (Scotland) Act 1963
- 48 Matters to be considered when assessing compensation
- 49 Matters to be ignored when assessing compensation
- 50 Compensation: partial acquisition etc.
- 51 Compensation: servitudes and other rights
- 52 Compensation: cutting down or lopping, or cutting back roots of, trees or shrubs
- 53 Compensation: stopping up
- 54 Compensation: entering and using land temporarily
- 55 Compensation: advance entry
- 56 Compensation where notice to treat becomes invalid
- Part 7 Statutory undertakers
- 57 Apparatus affected by works
- 58 Works for roads purposes
- 59 Compensation for removal of water, gas, electricity or communications apparatus
- 60 Compensation for removal of public sewer
- 61 Apparatus in stopped up roads
- Part 8 Planning permission, listed buildings and conservation areas
- 62 Planning permission
- 63 Relaxation of listed building controls
- 64 Demolition in conservation areas
- 65 Interpretation of Part 8
- Part 9 Environmental matters
- 66 Mitigation of environmental impact
- 67 Compliance with code of construction practice and noise and vibration policy
- 68 Amendment of code of construction practice and noise and vibration policy
- 69 Protection of water environment
- 70 Control of noise: Control of Pollution Act 1974
- 71 Statutory nuisance: noise under the Environmental Protection Act 1990
- Part 10 Miscellaneous
- 72 Blighted land
- 73 Certification of Parliamentary plans, etc.
- 74 Changes to Parliamentary plans or book of reference
- 75 Provision of information on the progress of the Forth Crossing works
- 76 Formal communications
- 77 Ancillary provision
- 78 Crown application
- 79 Interpretation
- 80 Commencement
- 81 Short title
- SCHEDULE 1 Principal works
- SCHEDULE 2 Ancillary works
- SCHEDULE 3 Special roads
- SCHEDULE 4 Proposed trunk roads
- SCHEDULE 5 Existing roads to become trunk roads on date determined by Ministers
- SCHEDULE 6 Roads to be transferred to local roads authorities
- SCHEDULE 7 Roads to be stopped up
- Part 1 Stopped up roads for which no substitute is listed
- Part 2 Stopped up roads for which substitute roads are listed
- SCHEDULE 8 Means of access to be stopped up
- Part 1 Means of access for which no substitute is listed
- Part 2 Means of access for which a substitute is listed
- SCHEDULE 9 Land which may be acquired
- Part 1 Acquisition of land
- Part 2 Acquisition of rights
- SCHEDULE 10 Temporary possession of land
- SCHEDULE 11 Listed buildings: authorised works