Commission Implementing Decision (EU) 2025/165 of 30 January 2025 on the harmonis... (32025D0165)
EU - Rechtsakte: 13 Industrial policy and internal market
2025/165
31.1.2025

COMMISSION IMPLEMENTING DECISION (EU) 2025/165

of 30 January 2025

on the harmonised standards for pressure equipment drafted in support of Directive 2014/68/EU of the European Parliament and of the Council

(Text with EEA relevance)

THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) No 1025/2012 of the European Parliament and of the Council of 25 October 2012 on European standardisation, amending Council Directives 89/686/EEC and 93/15/EEC and Directives 94/9/EC, 94/25/EC, 95/16/EC, 97/23/EC, 98/34/EC, 2004/22/EC, 2007/23/EC, 2009/23/EC and 2009/105/EC of the European Parliament and of the Council and repealing Council Decision 87/95/EEC and Decision No 1673/2006/EC of the European Parliament and of the Council (1), and in particular Article 10(6) thereof,
Whereas:
(1) In accordance with Article 12 of Directive 2014/68/EU of the European Parliament and of the Council (2), pressure equipment or assemblies referred to in Article 4(1) and (2) of that Directive, which are in conformity with harmonised standards or parts thereof the references of which have been published in the
Official Journal of the European Union
, are to be presumed to be in conformity with the essential safety requirements set out in Annex I to that Directive covered by those standards or parts thereof.
(2) By Implementing Decision C(2024) 1241 (3), the Commission made a request to the European Committee for Standardization (CEN) and the European Committee for Electrotechnical Standardization (Cenelec) for the revision of existing harmonised standards and the completion of the work on draft harmonised standards in support of Directive 2014/68/EU.
(3) On the basis of the request set out in Implementing Decision C(2024) 1241, CEN revised and amended the following harmonised standard: EN 19:2016 for industrial valves. This resulted in the adoption of the amending standard EN 19:2023. CEN also revised standards EN 12952-3:2011, EN 12952-8:2002, EN 12952-9:2002 and EN 12952-16:2002 for water-tube boilers and auxiliary installations. This resulted in the adoption of the following amending standards: EN 12952-3:2022, EN 12952-8:2022, EN 12952-9:2022 and EN 12952-16:2022. CEN further revised standard EN 15001-1:2009 for gas infrastructure, resulting in the revised standard EN 15001-1:2023. CEN also revised standard EN 15776:2011+A1:2015 for unfired pressure vessels, which resulted in the revised standard EN 15776:2022. CEN finally revised standards EN 13445-2:2021 and EN 13445-4:2021 for unfired pressure vessels, resulting in the revised standards EN 13445-2:2021+A1:2023 and EN 13445-4:2021+A1:2023. On the basis of Implementing Decision C(2024)1241 CEN drafted new harmonised standard EN 13480-3:2017/A5:2022 for metallic industrial piping, EN 13799:2022 for LPG equipment and accessories and EN 12261:2024 for gas meters.
(4) The Commission together with CEN has assessed whether the standards on pressure equipment as drafted, amended or revised by CEN comply with the request set out in Implementing Decision C(2024) 1241.
(5) Those standards satisfy the requirements which they aim to cover, and which are set out in Annex I to Directive 2014/68/EU. It is therefore appropriate to publish the references of those standards in the
Official Journal of the European Union
.
(6) In order to give manufacturers sufficient time to adapt their products to the revised versions of harmonised standards EN 19:2016, EN 12952-3:2011, EN 12952-8:2002, EN 12952-9:2002, EN 12952-16:2002, EN 15001-1:2009, EN 15776:2011+A1:2015, EN 13445-2:2021, EN 13445-4:2021 and EN 13480-3:2017 it is necessary to defer the withdrawal of the reference of those standards.
(7) The references of harmonised standards drafted in support of Directive 2014/68/EU are published in Commission Implementing Decision (EU) 2019/1616 (4) and Communication 2017/C 389/01 (5). In the interests of clarity and rationality, a complete list of references of harmonised standards drafted in support of Directive 2014/68/EU and satisfying the requirements they aim to cover should be published in a single legal act.
(8) Consequently, the references to harmonised standards published in Implementing Decision (EU) 2019/1616 and Communication 2017/C 389/01 should be published in an Annex to this Decision and both Implementing Decision (EU) 2019/1616 and Communication 2017/C 389/01 should be repealed.
(9) However, Communication 2017/C 389/01 should continue to apply to the references of the harmonised standards EN 19:2016, EN 12952-3:2011, EN 12952-8:2002, EN 12952-9:2002, EN 12952-16:2002, EN 15001-1:2009 and EN 15776:2011+A1:2015, and Implementing Decision (EU) 2019/1616 should continue to apply to the references of the harmonised standards EN 13445-2:2021, EN 13445-4:2021 and EN 13480-3:2017 until the date of withdrawal of those references.
(10) Compliance with a harmonised standard confers a presumption of conformity with the corresponding essential requirements set out in Union harmonisation legislation from the date of publication of the reference of such standard in the
Official Journal of the European Union
. This Decision should therefore enter into force on the day of its publication,
HAS ADOPTED THIS DECISION:

Article 1

The references of harmonised standards for pressure equipment or assemblies drafted in support of Directive 2014/68/EU, listed in Annex I to this Decision, are hereby published in the
Official Journal of the European Union
.

Article 2

Communication 2017/C 389/01 is repealed.
However, it shall continue to apply with respect to the references of the harmonised standards listed in Annex II to this Decision until the date of withdrawal of those references set out in that Annex.

Article 3

Implementing Decision (EU) 2019/1616 is repealed.
However, it shall continue to apply with respect to the references of the harmonised standards listed in Annex III to this Decision until the date of withdrawal of those references set out in that Annex.

Article 4

This Decision shall enter into force on the day following that of its publication in the
Official Journal of the European Union
.
Done at Brussels, 30 January 2025.
For the Commission
The President
Ursula VON DER LEYEN
(1)  
OJ L 316, 14.11.2012, p. 12
, ELI:
http://data.europa.eu/eli/reg/2012/1025/oj
.
(2)  Directive 2014/68/EU of the European Parliament and the Council of 15 May 2014 on the harmonisation of the laws of the Member States relating to the making available on the market of pressure equipment (
OJ L 189, 27.6.2014, p. 164
, ELI:
http://data.europa.eu/eli/dir/2014/68/oj
).
(3)  Commission Implementing Decision C(2024) 1241 final of 1 March 2024 on a standardisation request to the European Committee for Standardization and the European Committee for Electrotechnical Standardization as regards pressure equipment and assemblies in support of Directive 2014/68/EU of the European Parliament and of the Council.
(4)  Commission Implementing Decision (EU) 2019/1616 of 27 September 2019 on the harmonised standards for pressure equipment drafted in support of Directive 2014/68/EU of the European Parliament and of the Council (
OJ L 250, 30.9.2019, p. 95
, ELI:
http://data.europa.eu/eli/dec_impl/2019/1616/oj
).
(5)  Commission communication in the framework of the implementation of Directive 2014/68/EU of the European Parliament and of the Council on the harmonisation of the laws of the Member States relating to the making available on the market of pressure equipment (Publication of titles and references of harmonised standards under Union harmonisation legislation) (
OJ C 389, 17.11.2017, p. 1
).

ANNEX I

No

Reference of the standard

1.

EN 3-8:2021

Portable fire extinguishers – Part 8: Requirements for the construction, pressure resistance and mechanical tests for extinguishers with a maximum allowable pressure equal to or lower than 30 bar, which comply with the requirements of EN 3-7

2.

EN 19:2023

Industrial valves – Marking of metallic valves

3.

EN 267:2009+A1:2011

Automatic forced draught burners for liquid fuels

4.

EN 334:2005+A1:2009

Gas pressure regulators for inlet pressures up to 100 bar

5.

EN 378-2:2016

Refrigerating systems and heat pumps – Safety and environmental requirements – Part 2: Design, construction, testing, marking and documentation

6.

EN 593:2017

Industrial valves – Metallic butterfly valves for general purposes

7.

EN 676:2003+A2:2008

Automatic forced draught burners for gaseous fuels

EN 676:2003+A2:2008/AC:2008

8.

EN 764-4:2014

Pressure equipment – Part 4: Establishment of technical delivery conditions for metallic materials

9.

EN 764-5:2014

Pressure equipment – Part 5: Inspection documentation of metallic materials and compliance with the material specification

10.

EN 764-7:2002

Pressure equipment – Part 7: Safety systems for unfired pressure equipment

EN 764-7:2002/AC:2006

11.

EN 1057:2006+A1:2010

Copper and copper alloys – Seamless, round copper tubes for water and gas in sanitary and heating applications

12.

EN 1092-1:2018

Flanges and their joints – Circular flanges for pipes, valves, fittings and accessories, PN designated – Part 1: Steel flanges

13.

EN 1092-3:2003

Flanges and their joints – Circular flanges for pipes, valves, fittings and accessories, PN designated – Part 3: Copper alloy flanges

EN 1092-3:2003/AC:2007

14.

EN 1092-4:2002

Flanges and their joints – Circular flanges for pipes, valves, fittings and accessories, PN designated – Part 4: Aluminium alloy flanges

15.

EN 1171:2015

Industrial valves – Cast iron gate valves

16.

EN 1349:2009

Industrial process control valves

17.

EN 1515-4:2021

Flanges and their joints – Bolting – Part 4: Selection of bolting for equipment subject to the Pressure Equipment Directive 2014/68/EU

18.

EN 1562:2019

Founding – Malleable cast irons

19.

EN 1563:2018

Founding – Spheroidal graphite cast irons

20.

EN 1564:2011

Founding – Ausferritic spheroidal graphite cast irons

21.

EN 1591-1:2013

Flanges and their joints – Design rules for gasketed circular flange connections – Part 1: Calculation

22.

EN 1626:2008

Cryogenic vessels – Valves for cryogenic service

23.

EN 1653:1997

Copper and copper alloys – Plate, sheet and circles for boilers, pressure vessels and hot water storage units

EN 1653:1997/A1:2000

24.

EN 1759-3:2003

Flanges and their joints – Circular flanges for pipes, valves, fittings and accessories, Class designated – Part 3: Copper alloy flanges

EN 1759-3:2003/AC:2004

25.

EN 1759-4:2003

Flanges and their joint – Circular flanges for pipes, valves, fittings and accessories, class designated – Part 4: Aluminium alloy flanges

26.

EN 1797:2001

Cryogenic vessels – Gas/material compatibility

27.

EN 1866-2:2014

Mobile fire extinguishers – Part 2: Requirements for the construction, pressure resistance and mechanical tests for extinguishers, with a maximum allowable pressure equal to or lower than 30 bar, which comply with the requirements of EN 1866-1

28.

EN 1866-3:2013

Mobile fire extinguishers – Part 3: Requirements for the assembly, construction and pressure resistance of CO2 extinguishers which comply with the requirements of EN 1866-1

29.

EN 1983:2013

Industrial valves – Steel ball valves

30.

EN 1984:2010

Industrial valves – Steel gate valves

31.

EN ISO 4126-1:2013

Safety devices for protection against excessive pressure – Part 1: Safety valves (ISO 4126-1:2013)

EN ISO 4126-1:2013/A2:2019

32.

EN ISO 4126-2:2019

Safety devices for protection against excessive pressure – Part 2: Bursting disc safety devices (ISO 4126-2:2018)

33.

EN ISO 4126-3:2020

Safety devices for protection against excessive pressure – Part 3: Safety valves and bursting disc safety devices in combination (ISO 4126-3:2020)

34.

EN ISO 4126-4:2013

Safety devices for protection against excessive pressure – Part 4: Pilot-operated safety valves (ISO 4126-4:2013)

35.

EN ISO 4126-5:2013

Safety devices for protection against excessive pressure – Part 5: Controlled safety pressure relief systems (CSPRS) (ISO 4126-5:2013)

36.

EN ISO 4126-7:2013

Safety devices for protection against excessive pressure – Part 7: Common data (ISO 4126-7:2013)

37.

EN ISO 9606-1:2017

Qualification testing of welders – Fusion welding – Part 1: Steels (ISO 9606-1:2012 including Cor 1:2012 and Cor 2:2013)

38.

EN ISO 9606-2:2004

Qualification test of welders – Fusion welding – Part 2: Aluminium and aluminium alloys (ISO 9606-2:2004)

39.

EN ISO 9606-3:1999

Approval testing of welders – Fusion welding – Part 3: Copper and copper alloys (ISO 9606-3:1999)

40.

EN ISO 9606-4:1999

Approval testing of welders – Fusion welding – Part 4: Nickel and nickel alloys (ISO 9606-4:1999)

41.

EN ISO 9606-5:2000

Approval testing of welders – Fusion welding – Part 5: Titanium and titanium alloys, zirconium and zirconium alloys (ISO 9606-5:2000)

42.

EN ISO 9712:2022

Non-destructive testing – Qualification and certification of NDT personnel (ISO 9712:2021)

43.

EN 10028-1:2017

Flat products made of steels for pressure purposes – Part 1: General requirements

44.

EN 10028-2:2017

Flat products made of steels for pressure purposes – Part 2: Non-alloy and alloy steels with specified elevated temperature properties

45.

EN 10028-3:2017

Flat products made of steels for pressure purposes – Part 3: Weldable fine grain steels, normalized

46.

EN 10028-4:2017

Flat products made of steels for pressure purposes – Part 4: Nickel alloy steels with specified low temperature properties

47.

EN 10028-5:2017

Flat products made of steels for pressure purposes – Part 5: Weldable fine grain steels, thermomechanically rolled

48.

EN 10028-6:2017

Flat products made of steels for pressure purposes – Part 6: Weldable fine grain steels, quenched and tempered

49.

EN 10028-7:2016

Flat products made of steels for pressure purposes – Part 7: Stainless steels

50.

EN 10204:2004

Metallic products – Types of inspection documents

51.

EN 10213:2007+A1:2016

Steel castings for pressure purposes

52.

EN 10216-1:2013

Seamless steel tubes for pressure purposes – Technical delivery conditions – Part 1: Non-alloy steel tubes with specified room temperature properties

53.

EN 10216-2:2013

Seamless steel tubes for pressure purposes – Technical delivery conditions – Part 2: Non-alloy and alloy steel tubes with specified elevated temperature properties

54.

EN 10216-3:2013

Seamless steel tubes for pressure purposes – Technical delivery conditions – Part 3: Alloy fine grain steel tubes

55.

EN 10216-4:2013

Seamless steel tubes for pressure purposes – Technical delivery conditions – Part 4: Non-alloy and alloy steel tubes with specified low temperature properties

56.

EN 10216-5:2021

Seamless steel tubes for pressure purposes – Technical delivery conditions – Part 5: Stainless steel tubes

57.

EN 10217-1:2019

Welded steel tubes for pressure purposes – Technical delivery conditions – Part 1: Electric welded and submerged arc welded non-alloy steel tubes with specified room temperature properties

58.

EN 10217-2:2019

Welded steel tubes for pressure purposes – Technical delivery conditions – Part 2: Electric welded non-alloy and alloy steel tubes with specified elevated temperature properties

59.

EN 10217-3:2019

Welded steel tubes for pressure purposes – Technical delivery conditions – Part 3: Electric welded and submerged arc welded alloy fine grain steel tubes with specified room, elevated and low temperature properties

60.

EN 10217-4:2019

Welded steel tubes for pressure purposes – Technical delivery conditions – Part 4: Electric welded non-alloy steel tubes with specified low temperature properties

61.

EN 10217-5:2019

Welded steel tubes for pressure purposes – Technical delivery conditions – Part 5: Submerged arc welded non-alloy and alloy steel tubes with specified elevated temperature properties

62.

EN 10217-6:2019

Welded steel tubes for pressure purposes – Technical delivery conditions – Part 6: Submerged arc welded non-alloy steel tubes with specified low temperature properties

63.

EN 10217-7:2021

Welded steel tubes for pressure purposes – Technical delivery conditions – Part 7: Stainless steel tubes

64.

EN 10222-1:2017

Steel forgings for pressure purposes – Part 1: General requirements for open die forgings

65.

EN 10222-2:2017+A1:2021

Steel forgings for pressure purposes – Part 2: Ferritic and martensitic steels with specified elevated temperatures properties

66.

EN 10222-3:2017

Steel forgings for pressure purposes – Part 3: Nickel steels with specified low temperature properties

67.

EN 10222-4:2017+A1:2021

Steel forgings for pressure purposes – Part 4: Weldable fine grain steels with high proof strength

68.

EN 10222-5:2017

Steel forgings for pressure purposes – Part 5: Martensitic, austenitic and austenitic-ferritic stainless steels

69.

EN 10253-2:2021

Butt-welding pipe fittings – Part 2: Non alloy and ferritic alloy steels with specific inspection requirements

70.

EN 10253-4:2008

Butt-welding pipe fittings – Part 4: Wrought austenitic and austenitic-ferritic (duplex) stainless steels with specific inspection requirements

EN 10253-4:2008/AC:2009

71.

EN 10269:2013

Steels and nickel alloys for fasteners with specified elevated and/or low temperature properties

72.

EN 10272:2016

Stainless steel bars for pressure purposes

73.

EN 10273:2016

Hot rolled weldable steel bars for pressure purposes with specified elevated temperature properties

74.

EN 10305-4:2016

Steel tubes for precision applications – Technical delivery conditions – Part 4: Seamless cold drawn tubes for hydraulic and pneumatic power systems

75.

EN 10305-6:2016

Steel tubes for precision applications – Technical delivery conditions – Part 6: Welded cold drawn tubes for hydraulic and pneumatic power systems

76.

EN ISO 10931:2005

Plastics piping systems for industrial applications – Poly(vinylidene fluoride) (PVDF) – Specifications for components and the system (ISO 10931:2005)

EN ISO 10931:2005/A1:2015

77.

EN 12178:2016

Refrigerating systems and heat pumps – Liquid level indicating devices – Requirements, testing and marking

78.

EN 12263:1998

Refrigerating systems and heat pumps – Safety switching devices for limiting the pressure – Requirements and tests

79.

EN 12261:2024

Gas meters – Turbine gas meters

80.

EN 12266-1:2012

Industrial valves – Testing of metallic valves – Part 1: Pressure tests, test procedures and acceptance criteria – Mandatory requirements

81.

EN 12288:2010

Industrial valves – Copper alloy gate valves

82.

EN 12392:2016

Aluminium and aluminium alloys – Wrought products and cast products – Special requirements for products intended for the production of pressure equipment

83.

EN 12420:2014

Copper and copper alloys – Forgings

84.

EN 12434:2000

Cryogenic vessels – Cryogenic flexible hoses

EN 12434:2000/AC:2001

85.

EN 12451:2012

Copper and copper alloys – Seamless, round tubes for heat exchangers

86.

EN 12452:2012

Copper and copper alloys – Rolled, finned, seamless tubes for heat exchangers

87.

EN 12516-1:2014+A1:2018

Industrial valves – Shell design strength – Part 1: Tabulation method for steel valve shells

88.

EN 12516-2:2014+A1:2021

Industrial valves – Shell design strength – Part 2: Calculation method for steel valve shells

89.

EN 12516-3:2002

Valves – Shell design strength – Part 3: Experimental method

EN 12516-3:2002/AC:2003

90.

EN 12516-4:2014+A1:2018

Industrial valves – Shell design strength – Part 4: Calculation method for valve shells manufactured in metallic materials other than steel

91.

EN 12542:2020

LPG equipment and accessories – Static welded steel cylindrical pressure vessels, serially produced for the storage of Liquefied Petroleum Gas (LPG) having a volume not greater than 13 m3 – Design and manufacture

92.

EN 12735-1:2020

Copper and copper alloys – Seamless, round tubes for air conditioning and refrigeration – Part 1: Tubes for piping systems

93.

EN 12735-2:2016

Copper and copper alloys – Seamless, round tubes for air conditioning and refrigeration – Part 2: Tubes for equipment

94.

EN 12778:2002

Cookware – Pressure cookers for domestic use

EN 12778:2002/A1:2005

EN 12778:2002/AC:2003

95.

EN 12952-1:2015

Water-tube boilers and auxiliary installations – Part 1: General

96.

EN 12952-2:2021

Water-tube boilers and auxiliary installations – Part 2: Materials for pressure parts of boilers and accessories

97.

EN 12952-3:2022

Water-tube boilers and auxiliary installations – Part 3: Design and calculation for pressure parts of the boiler

98.

EN 12952-5:2021

Water-tube boilers and auxiliary installations – Part 5: Workmanship and construction of pressure parts of the boiler

99.

EN 12952-6:2021

Water-tube boilers and auxiliary installations – Part 6: Inspection during construction, documentation and marking of pressure parts of the boiler

100.

EN 12952-7:2012

Water-tube boilers and auxiliary installations – Part 7: Requirements for equipment for the boiler

101.

EN 12952-8:2022

Water-tube boilers and auxiliary installations – Part 8: Requirements for firing systems for liquid and gaseous fuels for the boiler

102.

EN 12952-9:2022

Water-tube boilers and auxiliary installations – Part 9: Requirements for firing systems for pulverized solid fuels for the boiler

103.

EN 12952-10:2021

Water-tube boilers and auxiliary installations – Part 10: Requirements for safety devices against excessive pressure

104.

EN 12952-11:2007

Water-tube boilers and auxiliary installations – Part 11: Requirements for limiting devices of the boiler and accessories

105.

EN 12952-14:2004

Water-tube boilers and auxiliary installations – Part 14: Requirements for flue gas DENOX-systems using liquefied pressurized ammonia and ammonia water solution

106.

EN 12952-16:2022

Water-tube boilers and auxiliary installations – Part 16: Requirements for grate and fluidized-bed firing systems for solid fuels for the boiler

107.

EN 12952-18:2012

Water-tube boilers and auxiliary installations – Part 18: Operating instructions

108.

EN 12953-1:2012

Shell boilers – Part 1: General

109.

EN 12953-2:2012

Shell boilers – Part 2: Materials for pressure parts of boilers and accessories

110.

EN 12953-3:2016

Shell boilers – Part 3: Design and calculation for pressure parts

111.

EN 12953-4:2018

Shell boilers – Part 4: Workmanship and construction of pressure parts of the boiler

112.

EN 12953-5:2020

Shell boilers – Part 5: Inspection during construction, documentation and marking of pressure parts of the boiler

113.

EN 12953-6:2011

Shell Boilers – Part 6: Requirements for equipment for the boiler

114.

EN 12953-7:2002

Shell boilers – Part 7: Requirements for firing systems for liquid and gaseous fuels for the boilers

115.

EN 12953-8:2001

Shell boilers – Part 8: Requirements for safeguards against excessive pressure

EN 12953-8:2001/AC:2002

116.

EN 12953-9:2007

Shell boilers – Part 9: Requirements for limiting devices of the boiler and accessories

117.

EN 12953-12:2003

Shell boilers – Part 12: Requirements for grate firing systems for solid fuels for the boiler

118.

EN 12953-13:2012

Shell boilers – Part 13: Operating instructions

119.

EN 13121-1:2021

GRP tanks and vessels for use above ground – Part 1: Raw materials – Specification conditions and acceptance criteria

120.

EN 13121-2:2003

GRP tanks and vessels for use above ground – Part 2: Composite materials – Chemical resistance

121.

EN 13121-3:2016

GRP tanks and vessels for use above ground – Part 3: Design and workmanship

122.

EN 13134:2000

Brazing – Procedure approval

123.

EN 13136:2013+A1:2018

Refrigerating systems and heat pumps – Pressure relief devices and their associated piping – Methods for calculation

124.

EN 13175:2019+A1:2020

LPG Equipment and accessories – Specification and testing for Liquefied Petroleum Gas (LPG) pressure vessel valves and fittings

125.

EN 13348:2016

Copper and copper alloys – Seamless, round copper tubes for medical gases or vacuum

126.

EN 13371:2001

Cryogenic vessels – Couplings for cryogenic service

127.

EN 13397:2001

Industrial valves – Diaphragm valves made of metallic materials

128.

EN 13445-1:2021

Unfired pressure vessels – Part 1: General

129.

EN 13445-2:2021+A1:2023

Unfired pressure vessels – Part 2: Materials

130.

EN 13445-3:2021

Unfired pressure vessels – Part 3: Design

131.

EN 13445-4:2021+A1:2023

Unfired pressure vessels – Part 4: Fabrication

132.

EN 13445-5:2021

Unfired pressure vessels – Part 5: Inspection and testing

133.

EN 13445-6:2021

Unfired pressure vessels – Part 6: Requirements for the design and fabrication of pressure vessels and pressure parts constructed from spheroidal graphite cast iron

134.

EN 13445-8:2021

Unfired pressure vessels – Part 8: Additional requirements for pressure vessels of aluminium and aluminium alloys

135.

EN 13445-10:2021

Unfired pressure vessels – Part 10: Additional requirements for pressure vessels of nickel and nickel alloys

136.

EN 13458-1:2002

Cryogenic vessels – Static vacuum insulated vessels – Part 1: Fundamental requirements

137.

EN 13458-2:2002

Cryogenic vessels – Static vacuum insulated vessels – Part 2: Design, fabrication, inspection and testing

EN 13458-2:2002/AC:2006

138.

EN 13480-1:2017

Metallic industrial piping – Part 1: General

EN 13480-1:2017/A1:2019

139.

EN 13480-2:2017

Metallic industrial piping – Part 2: Materials

EN 13480-2:2017/A3:2018

EN 13480-2:2017/A1:2018

EN 13480-2:2017/A2:2018

EN 13480-2:2017/A7:2020

EN 13480-2:2017/A8:2021

140.

EN 13480-3:2017

Metallic industrial piping – Part 3: Design and calculation

EN 13480-3:2017/A3:2020

EN 13480-3:2017/A2:2020

EN 13480-3:2017/A1:2021

EN 13480-3:2017/A4:2021

EN 13480-3:2017/A5:2022

141.

EN 13480-4:2012

Metallic industrial piping – Part 4: Fabrication and installation

EN 13480-4:2012/A1:2013

EN 13480-4:2012/A2:2015

142.

EN 13480-5:2017

Metallic industrial piping – Part 5: Inspection and testing

EN 13480-5:2017/A1:2019

EN 13480-5:2017/A2:2021

143.

EN 13480-6:2017

Metallic industrial piping – Part 6: Additional requirements for buried piping

EN 13480-6:2017/A1:2019

144.

EN 13480-8:2017

Metallic industrial piping – Part 8: Additional requirements for aluminium and aluminium alloy piping

145.

EN 13547:2013

Industrial valves – Copper alloy ball valves

146.

EN ISO 13585:2012

Brazing – Qualification test of brazers and brazing operators (ISO 13585:2012)

147.

EN 13648-1:2008

Cryogenic vessels – Safety devices for protection against excessive pressure – Part 1: Safety valves for cryogenic service

148.

EN 13648-2:2002

Cryogenic vessels – Safety devices for protection against excessive pressure – Part 2: Bursting disc safety devices for cryogenic service

149.

EN 13709:2010

Industrial valves – Steel globe and globe stop and check valves

150.

EN 13789:2010

Industrial valves – Cast iron globe valves

151.

EN 13799:2022

LPG equipment and accessories – Contents gauges for Liquefied Petroleum Gas (LPG) pressure vessels

152.

EN 13831:2007

Closed expansion vessels with built in diaphragm for installation in water

153.

EN 13835:2012

Founding – Austenitic cast irons

154.

EN 13923:2005

Filament-wound FRP pressure vessels – Materials, design, manufacturing and testing

155.

EN 14129:2014

LPG Equipment and accessories – Pressure relief valves for LPG pressure vessels

156.

EN 14197-1:2003

Cryogenic vessels – Static non-vacuum insulated vessels – Part 1: Fundamental requirements

157.

EN 14197-2:2003

Cryogenic vessels – Static non-vacuum insulated vessels – Part 2: Design, fabrication, inspection and testing

EN 14197-2:2003/A1:2006

EN 14197-2:2003/AC:2006

158.

EN 14197-3:2004

Cryogenic vessels – Static non-vacuum insulated vessels – Part 3: Operational requirements

EN 14197-3:2004/A1:2005

EN 14197-3:2004/AC:2004

159.

EN 14222:2021

Stainless steel steam boilers

160.

EN 14276-1:2020

Pressure equipment for refrigerating systems and heat pumps – Part 1: Vessels – General requirements

161.

EN 14276-2:2020

Pressure equipment for refrigerating systems and heat pumps – Part 2: Piping – General requirements

162.

EN 14359:2006+A1:2010

Gas-loaded accumulators for fluid power applications

163.

EN 14382:2005+A1:2009

Safety devices for gas pressure regulating stations and installations – Gas safety shut-off devices for inlet pressures up to 100 bar

EN 14382:2005+A1:2009/AC:2009

164.

EN 14394:2005+A1:2008

Heating boilers – Heating boilers with forced draught burners – Nominal heat output not exceeding 10 MW and maximum operating temperature of 110 °C

165.

EN 14570:2014

LPG equipment and accessories – Equipping of overground and underground LPG vessels

166.

EN 14585-1:2006

Corrugated metal hose assemblies for pressure applications – Part 1: Requirements

167.

EN 14917:2021

Metal bellows expansion joints for pressure applications

168.

EN 15001-1:2023

Gas Infrastructure – Gas installation pipework with an operating pressure greater than 0,5 bar for industrial installations and greater than 5 bar for industrial and non-industrial installations – Part 1: Detailed functional requirements for design, materials, construction, inspection and testing

169.

EN ISO 15493:2003

Plastics piping systems for industrial applications – Acrylonitrile-butadiene-styrene (ABS), unplasticized poly(vinyl chloride) (PVC-U) and chlorinated poly(vinyl chloride) (PVC-C) – Specifications for components and the system – Metric series (ISO 15493:2003)

EN ISO 15493:2003/A1:2017

170.

EN ISO 15494:2018

Plastics piping systems for industrial applications – Polybutene (PB), polyethylene (PE), polyethylene of raised temperature resistance (PE-RT), crosslinked polyethylene (PE-X), polypropylene (PP) – Metric series for specifications for components and the system (ISO 15494:2015)

171.

EN ISO 15613:2004

Specification and qualification of welding procedures for metallic materials – Qualification based on pre-production welding test (ISO 15613:2004)

172.

EN ISO 15614-1:2004

Specification and qualification of welding procedures for metallic materials – Welding procedure test – Part 1: Arc and gas welding of steels and arc welding of nickel and nickel alloys (ISO 15614-1:2004)

EN ISO 15614-1:2004/A1:2008

EN ISO 15614-1:2004/A2:2012

173.

EN ISO 15614-2:2005

Specification and qualification of welding procedures for metallic materials – Welding procedure test – Part 2: Arc welding of aluminium and its alloys (ISO 15614-2:2005)

EN ISO 15614-2:2005/AC:2009

174.

EN ISO 15614-4:2005

Specification and qualification of welding procedures for metallic materials – Welding procedure test – Part 4: Finishing welding of aluminium castings (ISO 15614-4:2005)

EN ISO 15614-4:2005/AC:2007

175.

EN ISO 15614-5:2004

Specification and qualification of welding procedures for metallic materials – Welding procedure test – Part 5: Arc welding of titanium, zirconium and their alloys (ISO 15614-5:2004)

176.

EN ISO 15614-6:2006

Specification and qualification of welding procedures for metallic materials – Welding procedure test – Part 6: Arc and gas welding of copper and its alloys (ISO 15614-6:2006)

177.

EN ISO 15614-7:2007

Specification and qualification of welding procedures for metallic materials – Welding procedure test – Part 7: Overlay welding (ISO 15614-7:2007)

178.

EN ISO 15614-8:2016

Specification and qualification of welding procedures for metallic materials – Welding procedure test – Part 8: Welding of tubes to tube-plate joints (ISO 15614-8:2016)

179.

EN ISO 15614-11:2002

Specification and qualification of welding procedures for metallic materials – Welding procedure test – Part 11: Electron and laser beam welding (ISO 15614-11:2002)

180.

EN ISO 15620:2019

Welding – Friction welding of metallic materials (ISO 15620:2019)

181.

EN 15776:2022

Unfired pressure vessels – Requirements for the design and fabrication of pressure vessels and pressure vessel parts constructed from cast iron with an elongation after fracture equal or less than 15 %

182.

EN ISO 16135:2006

Industrial valves – Ball valves of thermoplastics materials (ISO 16135:2006)

EN ISO 16135:2006/A1:2019

183.

EN ISO 16136:2006

Industrial valves – Butterfly valves of thermoplastics materials (ISO 16136:2006)

EN ISO 16136:2006/A1:2019

184.

EN ISO 16137:2006

Industrial valves – Check valves of thermoplastics materials (ISO 16137:2006)

EN ISO 16137:2006/A1:2019

185.

EN ISO 16138:2006

Industrial valves – Diaphragm valves of thermoplastics materials (ISO 16138:2006)

EN ISO 16138:2006/A1:2019

186.

EN ISO 16139:2006

Industrial valves – Gate valves of thermoplastics materials (ISO 16139:2006)

EN ISO 16139:2006/A1:2019

187.

EN 16668:2016+A1:2018

Industrial valves – Requirements and testing for metallic valves as pressure accessories

188.

EN 16767:2020

Industrial valves – Metallic check valves

189.

EN 17278:2021

Natural gas vehicles – Vehicle fuelling appliances

190.

EN ISO 21009-2:2015

Cryogenic vessels – Static vacuum insulated vessels – Part 2: Operational requirements (ISO 21009-2:2015)

191.

EN ISO 21013-3:2016

Cryogenic vessels – Pressure-relief accessories for cryogenic service – Part 3: Sizing and capacity determination (ISO 21013-3:2016)

192.

EN ISO 21028-1:2016

Cryogenic vessels – Toughness requirements for materials at cryogenic temperature – Part 1: Temperatures below – 80 °C (ISO 21028-1:2016)

193.

EN ISO 21028-2:2018

Cryogenic vessels – Toughness requirements for materials at cryogenic temperature – Part 2: Temperatures between -80 degrees C and -20 degrees C (ISO 21028-2:2018)

194.

EN ISO 21787:2006

Industrial valves – Globe valves of thermoplastics materials (ISO 21787:2006)

EN ISO 21787:2006/A1:2019

195.

EN ISO 21922:2021

Refrigerating systems and heat pumps – Valves – Requirements, testing and marking (ISO 21922:2021)

ANNEX II

No

Reference of the standard

Date of withdrawal

1.

EN 19:2016

Industrial valves – Marking of metallic valves

31.7.2026

2.

EN 12952-3:2011

Water-tube boilers and auxiliary installations – Part 3: Design and calculation for pressure parts of the boiler

31.7.2026

3.

EN 12952-8:2002

Water-tube boilers and auxiliary installations – Part 8: Requirements for firing systems for liquid and gaseous fuels for the boiler

31.7.2026

4.

EN 12952-9:2002

Water-tube boilers and auxiliary installations – Part 9: Requirements for firing systems for pulverized solid fuels for the boiler

31.7.2026

5.

EN 12952-16:2002

Water-tube boilers and auxiliary installations – Part 16: Requirements for grate and fluidized-bed firing systems for solid fuels for the boiler

31.7.2026

6.

EN 15001-1:2009

Gas Infrastructure – Gas installation pipework with an operating pressure greater than 0,5 bar for industrial installations and greater than 5 bar for industrial and non-industrial installations – Part 1: Detailed functional requirements for design, materials, construction, inspection and testing

31.7.2026

7.

EN 15776:2011+A1:2015

Unfired pressure vessels – Requirements for the design and fabrication of pressure vessels and pressure parts constructed from cast iron with an elongation after fracture equal or less than 15 %

31.7.2026

ANNEX III

No

Reference of the standard

Date of withdrawal

1.

EN 13445-2:2021

Unfired pressure vessels – Part 2: Materials

31.7.2026

2.

EN 13445-4:2021

Unfired pressure vessels – Part 4: Fabrication

31.7.2026

3.

EN 13480-3:2017

Metallic industrial piping – Part 3: Design and calculation

EN 13480-3:2017/A3:2020

EN 13480-3:2017/A2:2020

EN 13480-3:2017/A1:2021

EN 13480-3:2017/A4:2021

31.7.2026

ELI: http://data.europa.eu/eli/dec_impl/2025/165/oj
ISSN 1977-0677 (electronic edition)
Markierungen
Leseansicht